Long-duration energy storage / CAISO · WECC · ERCOT

Building the grid infrastructure the energy transition needs next.

Fly Over Energy originates and advances utility-scale long-duration storage projects in CAISO, with a platform designed for selective expansion across the broader WECC and ERCOT markets.

FOE / DEVELOPMENT INTELLIGENCE LIVE SCREENING
01Interconnection-led origination
02Stage-gated capital deployment
03Long-duration storage focus
04Built by energy operators

The transition needs duration, location and discipline.

The transition does not simply need more megawatts. It needs storage positioned where the grid can use it—when the grid needs it most.

FOE is building a repeatable development platform around that constraint. We focus on long-duration projects with a credible interconnection path, strong siting fundamentals and multiple routes to value creation.

02

Location before scale.

Origination begins with grid need, substation context and an actionable interconnection route—not an indiscriminate land pipeline.

03

Capital follows evidence.

Development spend advances through defined gates so capital is concentrated on the projects with the strongest risk-adjusted path.

Infrastructure experience,
made repeatable.

FOE combines energy-market judgment with a systematic development process built to improve project quality at each capital decision.

01

Originate

Start with grid need, market signal and site potential.

02

Screen

Apply QC16 across sixteen development and investment factors.

03

De-risk

Advance interconnection, land, permitting and commercial workstreams.

04

Realize

Create optionality for partnership, project sale or retained ownership.

QC16

FOE’s internal 16-factor screen evaluates grid, site, market and execution risk before significant development capital is committed.

01GridInterconnection readiness
02SiteControl and constructability
03MarketNeed and commercial fit
04ExecutionSchedule and development risk

Portfolio construction,
not project accumulation.

FOE is advancing a 655 MW / 5,908 MWh long-duration storage platform assembled around a common development thesis, with disciplined project selection and capital visibility.

Discuss the platform
FOE PORTFOLIO SYSTEMAGGREGATE PUBLIC DISCLOSURE
655MWPortfolio capacity
5,908MWhPortfolio energy
01

Diversified by design

Utility territory, interconnection route, site type and commercial timing are balanced at the portfolio level.

02

Sequenced capital

Portfolios advance on a deliberate cadence, allowing early evidence to strengthen each successive investment decision.

03

Flexible realization

The structure supports project sales, strategic partnerships and selective ownership without forcing one exit path.

Designed to convert development risk into asset value.

FOE advances projects through defined, evidence-based gates, preserving capital for opportunities with the strongest risk-adjusted path.

Institutional inquiries
01

Stage-gated development

Advance the next proof point, then reassess.

→
02

Project-level visibility

Track milestones and exposure by asset.

→
03

Portfolio-level learning

Apply evidence across a repeatable platform.

→
04

Flexible realization

Preserve partnership and ownership optionality.

→

Founder-led.
Built for execution.

John Meinecke Founder & Chief Executive Officer

John is an energy infrastructure executive with experience spanning utility-scale renewables, battery storage, EPC delivery, interconnection and project development. He founded Fly Over Energy to bring disciplined infrastructure execution and capital allocation to long-duration storage development.

Build the infrastructure
behind the next grid.

FOE welcomes conversations with institutional capital providers and strategic partners aligned with disciplined long-duration storage development.

Contact Fly Over Energy Institutional capital and strategic partner inquiries